• KISSmyOSFeddit@lemmy.world
    link
    fedilink
    arrow-up
    0
    ·
    edit-2
    28 days ago

    How long from “design concept” till enough are tested, certified and built to help combat climate change? We have about 20 years left to transform our energy sector if you’re optimistic. Building one with the old proven design takes about 15 years.

    • Vanth@reddthat.com
      link
      fedilink
      English
      arrow-up
      0
      ·
      27 days ago

      The technical design was done in 2020. It took two years for the design to be approved by the US department responsible for approving such things and it will take until 2029 to get an actual plant approved and built. That’s why I said probably not in the US and only with a lot of political will.

      There’s no climate change solution that won’t take significant political will.

      • KISSmyOSFeddit@lemmy.world
        link
        fedilink
        arrow-up
        0
        ·
        27 days ago

        But there are solutions that simply require building more small units of something that’s been built in large numbers for the past decade.

        • Vanth@reddthat.com
          link
          fedilink
          English
          arrow-up
          0
          ·
          27 days ago

          Are you talking about nuclear or other as these “simply build smaller” solutions?

            • Vanth@reddthat.com
              link
              fedilink
              English
              arrow-up
              0
              ·
              27 days ago

              Oh. Well, those also have resource constraints (hazardous and rare materials used in solar panels, batteries for both if that is method of storage), storage constraints (saving energy for when the sun isn’t shining and the wind isn’t blowing), economic constraints (still more expensive than burning coal and oil) and political constraints (people don’t want solar panels or wind turbines in their backyard + political will to stand up against oil and to offer incentives that make solar/wind financially viable).

              Same themes as the challenges to nuclear.

    • ChaoticNeutralCzech@feddit.de
      link
      fedilink
      arrow-up
      0
      ·
      27 days ago

      Building one with the old proven design takes about 15 years.

      Source? I’d say the median is closer to 8, 15 years is more like the worst 5-15% percentile.