Sometimes on Lemmy these seem like the only jobs that actually exist, but I’m sure there’s a lot of people here with different and unusual lines of work.

  • it_depends_man@lemmy.world
    link
    fedilink
    English
    arrow-up
    0
    ·
    14 days ago

    I helped design large-ish electrical grids. 30-100k cables

    Without the actual calculation bits, unfortunately.

    Not very interesting. Bad software. Management didn’t really care about the problem. I was there so the problem was “managed” from their point of view.

      • it_depends_man@lemmy.world
        link
        fedilink
        English
        arrow-up
        0
        ·
        13 days ago

        The boring part. Making sure that there are holes in the walls for sockets, enough capacity in the cable trays. Planning the routing, but I didn’t have access to algorithm of the software.

        Collecting the ever changing inputs from people who want devices with cables in rooms and spaces. :)